1. Request the handover pack
Ask for the notice, outstanding amounts and documents required to collect the keys. Clarify who may attend if the owner is overseas.
Read the appointment terms and ask how defects should be recorded. For a newly completed home, establish the process for reporting issues after the inspection.
2. Inspect the fabric
Check doors, windows, walls, floors and joinery room by room. Photograph each concern and include a location so the contractor can find it.
An independent inspector may be useful where you need technical assessment. Avoid treating a quick walkthrough as confirmation that concealed systems or waterproofing are sound.
3. Check the services
Test accessible lights, sockets, water supply and cooling controls where permitted. Ask for the operating instructions for fitted equipment and any relevant warranties.
Record anything that could not be tested because a service was disconnected. A test left incomplete should remain visible in the report instead of being marked satisfactory.
4. Log the defects
Keep a numbered schedule of observations with photographs and dates. Separate issues affecting safe occupation from cosmetic items so follow-up can be prioritised.
Ask for acknowledgement of the schedule and the method for arranging remedial access. Do not assume a verbal assurance has been added to the developer records.
5. Complete the record
Count keys, access cards and parking controls. Retain meter readings, building contacts and the signed handover papers with your property file.
Schedule a follow-up check after agreed repairs. Before moving in or letting the home, confirm utility activation and the applicable building access arrangements.
Your working checklist.
- Documents and balance reviewed
- Inspection observations photographed
- Untested systems recorded
- Keys and access cards counted
Official reference: Dubai Land Department. Check the current requirements before acting.
Questions, answered.
What should I check: request the handover pack?
Ask for the notice, outstanding amounts and documents required to collect the keys. Clarify who may attend if the owner is overseas. Read the appointment terms and ask how defects should be recorded. For a newly completed home, establish the process for reporting issues after the inspection.
What should I check: inspect the fabric?
Check doors, windows, walls, floors and joinery room by room. Photograph each concern and include a location so the contractor can find it. An independent inspector may be useful where you need technical assessment. Avoid treating a quick walkthrough as confirmation that concealed systems or waterproofing are sound.
What should I check: check the services?
Test accessible lights, sockets, water supply and cooling controls where permitted. Ask for the operating instructions for fitted equipment and any relevant warranties. Record anything that could not be tested because a service was disconnected. A test left incomplete should remain visible in the report instead of being marked satisfactory.
What should I check: log the defects?
Keep a numbered schedule of observations with photographs and dates. Separate issues affecting safe occupation from cosmetic items so follow-up can be prioritised. Ask for acknowledgement of the schedule and the method for arranging remedial access. Do not assume a verbal assurance has been added to the developer records.
What should I check: complete the record?
Count keys, access cards and parking controls. Retain meter readings, building contacts and the signed handover papers with your property file. Schedule a follow-up check after agreed repairs. Before moving in or letting the home, confirm utility activation and the applicable building access arrangements.